INFRASTRUCTURE SPECIFICATIONS...

 

Specifications for Utility Infrastructure and various procedural and technical guidelines:

 

·    Specifications for Utility Infrastructure (Effective 081229)

·    Procedural Guidance Governing Utility System Infrastructure Additions (Revised 081126)

·    Water System Flow Test Policy (Effective 080630)

·    Required Plat Certification Statement (Effective 080630)

·    Sanitary Sewer Service Installation Guidance (Effective 080630)

·    Standard Pressure Sewer Service Connection (Effective 080708)

 

For more information, please contact Larry Stejskal, Engineering Manager, at lstejskal@northbaldwinutilities.com or (251) 580-1626.

 

 

NBU works to protect your water supply by maintaining existing water sytems, treating used water...MORE Wastewater Treatment is the process of cleaning used water and sewage so it can be returned to the...MORE Clean, plentiful, efficiant and safe when used properly, natural gas is a reliable and efficiant energy...MORE
Post Office Box 1207  |  25 Hand Avenue  |  Bay Minette, Alabama 36507  |   251.580.1626 phone  |  251.937.0345 fax